
In 2012 the German nuclear power plants generated 99.46 billion kilowatt hours of electricity. As of 7th August 2011, 9 nuclear power plants with an electric gross output of 12,696 MW are in operation.
| Nuclear Power Plant in Operation | Type | Rated Capacity (gross) MW |
Electricity Generation
2012 (gross) GWH
|
|
| KBR Brokdorf | ![]() |
PWR | 1,480 | 10,768 |
| KWG Grohnde | PWR | 1,430 | 11,692 | |
| KKE Emsland |
|
PWR | 1,400 | 11,431 |
| KKG Grafenrheinfeld | PWR | 1,345 | 10,602 | |
| KKP-2 Philippsburg | PWR | 1,468 | 10,779 | |
| GKN-2 Neckarwestheim |
PWR | 1,400 | 11,127 | |
| KKI-2 Isar | PWR | 1,485 | 12,082 | |
| KRB B Gundremmingen | BWR | 1,344 | 10,366 | |
| KRB C Gundremmingen | BWR | 1,344 | 10,613 |
As of: 28.01.2013
PWR: Pressurized Water Reactor
BWR: Boiling Water Reactor
In continuous none power operation since 7.8.2011 in accordance with Section 1 of the 13th amendment of the German Atomic Energy Act:
| Nuclear Power Plant End of Licence 7th August 2011 |
Type | Rated Capacity (gross) MW |
|
| KKB Brunsbüttel | ![]() |
BWR | 806 |
| KKU Unterweser | PWR | 1,410 | |
| KKK Krümmel | BWR | 1,402 | |
| KWB A Biblis | PWR | 1,225 | |
| KWB B Biblis | PWR | 1,300 | |
| KKP-1 Philippsburg | BWR | 926 | |
| GKN-1 Neckarwestheim | PWR | 840 | |
| KKI-1 Isar | BWR | 912 |
As of: 28.01.2013
PWR: Pressurized Water Reactor
BWR: Boiling Water Reactor